Industrial plotting · Kala Talav, Bhavnagar · Shivanand Group

Industrial land where the Dholera corridor meets Bhavnagar.

Serviced industrial plots on the Bhavnagar–Ahmedabad highway at Kala Talav: twenty-five kilometres from the new expressway, nineteen from the port, fifteen minutes from the city. Drawn plot by plot, sold by survey number, by a builder with fourteen projects delivered here.

21.8578° N · 72.1176° E NH 751 · 60 m main road Policy window 2026–31
Ahmedabad138 km · ~2 h via expressway Dholera Intl. Airport72 km · opening late 2026 Dholera SIR · Tata fab46 km · fab 50% built Adhelai25 km · expressway ends here OCEAN INDUSTRIAL PARKKala Talav · NH 751 Bhavnagar city13 km · terminus 11 km Port · CNG terminal19 kmKalpasar → Surat Alang62 km · ship recycling
Tap a stop on the drawing, or let it tour
Five parks
SR 334–398
Frontage
60 m main road
Expressway end
24.6 km
Dholera SIR
45.7 km
Bhavnagar Port
19.4 km
MSME ceiling
up to 35%

Why this plot

01

Beside Dholera. With a city behind you.

Land inside the SIR is bulk and priced for developers. This is revenue land on the same highway, with Bhavnagar fifteen minutes away.

01 · ROAD

On the road the expressway feeds.

The Ahmedabad–Dholera Expressway ends at Adhelai, twenty minutes north. The park fronts the highway that carries it into Bhavnagar.

02 · PORT AND SUPPLY CHAIN

Nineteen kilometres from a port being rebuilt.

The world’s first CNG terminal and a lock-gated container port. Nirma’s chemical complex eight kilometres east, Alang an hour south.

03 · POLICY

A five-year incentive window, open now.

Under the 2026 policy an MSME here can stack capital, interest and power support up to 35% of eligible investment, until May 2031.

By road, from the gate

02

Four distances that decide the business.

km
Adhelai, where the 109 km expressway to Ahmedabad begins
km
Dholera SIR and Tata’s ₹91,000 crore semiconductor fab
km
Bhavnagar Port and the world’s first CNG terminal
km
Bhavnagar city: workforce, rail terminus, airport

The land

Five parks, already drawn plot by plot.

Survey numbers 334 to 398 on the Kalatalav village map, laid out on 60, 18 and 12 metre roads with a 20 by 25 metre standard plot and larger parcels on the cross-over road. Villa parcels beside the park for the people who run the units.

The placement

One pin. Three economies within an hour.

North, the Dholera corridor: expressway, airport, fab, rail. South, Bhavnagar: labour, terminus, airport, port. East, the sea: the CNG terminal, the ferry to Surat, Alang, and Kalpasar if it is built.

Proposed rail and the Kalpasar dyke are indicative. Imagery © Esri, Maxar, Earthstar Geographics; map data © OpenStreetMap contributors, © CARTO.

What changes next

03

Built in a known order.

DONE · MARCH 2026

Expressway open

Sarkhej to Adhelai, 109 km. Ahmedabad in about two hours.

BUILDING · 2026

Airport and fab

Dholera airport about 80% built; Tata fab past halfway, trial output targeted December.

APPROVED · 2030–31

Rail, then the sea link

220 km/h rail to Dholera; Bhavnagar freight line under survey; Kalpasar at DPR stage.

The group behind the pin

Shivanand Group. Fourteen projects delivered in Bhavnagar.

Developed by Shivanand Land Development Corp., one of six group companies. Walk through what they have built before you buy what they are plotting.

Completed projects in Bhavnagar
Group companies
yrs
Managing partners’ experience
Projects under construction, handover March 2027

Updates

04

What moved on the corridor this quarter.

Come and see

05

Stand on the plot. Then decide.

A completed Shivanand building, the highway at Kala Talav, then your parcel with the survey extracts in hand.