Kalpasar, the dam across the Gulf of Khambhat that Gujarat has discussed since the 1980s, is moving again. The latest reports put the estimate at ₹1.57 lakh crore, describe a 60 km dam between the Bhavnagar and Bharuch coasts, a freshwater reservoir of about 13,000 million cubic metres, and a 16-lane highway on the crest. Gujarat and the Centre are exploring a partnership with the Netherlands, the country that has closed more sea inlets than any other, and an Indo-Dutch expert group is under consideration.
Video: NewsCapital Gujarat, in Gujarati.
What has actually happened
- 30 March 2026: Chief Minister Bhupendra Patel met the Netherlands’ ambassador, Marisa Gerards, and discussed an Indo-Dutch expert group and a government-to-government partnership on the project.
- 18 May 2026: during the Prime Minister’s visit to the Netherlands, the Ministry of Jal Shakti and the Dutch Ministry of Infrastructure and Water Management signed a letter of intent on technical cooperation for Kalpasar, with Royal Haskoning named on the closure methodology.
- May 2026: the state applied for environmental clearance with a project estimate of ₹1,33,246 crore; the detailed project report had reached finalisation in December 2025.
- September 2026: the figures now in circulation, ₹1.57 lakh crore, 13,000 MCM and a 16-lane road, are higher than the clearance filing. Treat them as the direction of travel until a revised DPR or a sanction order is published.
Why the numbers keep changing
Older references still quote ₹90,000 crore; the clearance filing says ₹1.33 lakh crore; the latest reports say ₹1.57 lakh crore. The reservoir has been described at 7,807 MCM live storage in the filing and about 13,000 MCM in the new reports. That spread is normal for a project at DPR stage. What has not changed is the alignment: a landing on the Bhavnagar side with a flank road to NH 751, and Bhavnagar to Surat falling from about 240 km to about 60. The stated benefits also hold: irrigation for about a million hectares across 42 talukas, and wind and solar generation on the structure.
A 16-lane road on the dam would make the Bhavnagar side of the Gulf a through-route to South Gujarat rather than a dead end. NH 751, the road the park fronts, is the flank it connects to.

Status
Proposed; DPR stage; environmental clearance applied for; technical cooperation with the Netherlands at letter-of-intent stage; expert group under consideration. No sanction, no construction. We carry it on the timeline as proposed and will move it when a sanction order exists. Buy the plot for the expressway, the port and the city; treat the dam as upside.
Sources
- Kalpasar project gains momentum with Dutch water management cooperation, The News Mill, 18 May 2026
- PM Modi taps Dutch expertise to fast-track Kalpasar project, Open Magazine
- Why Modi is betting on Dutch tech for Kalpasar, The Federal
- Kalpasar Project to link Bhavnagar and Bharuch through 60-km dyke route, DeshGujarat, 29 May 2026
- Kalpasar Dam Project Gujarat, NewsCapital Gujarat (video)
- Kalpasar Project, Government of Gujarat
Compiled from public sources on the date shown. Third-party projects belong to their agencies; statuses and dates may change. This note is information, not advice, and not part of any offer.